"The Stewart Island project is expected to reduce diesel consumption by 200,000 litres within two years of beginning. During construction, about 40 high-skilled workers will be required."
Share this post
$15m loan for Stewart Island solar farm
Share this post
"The Stewart Island project is expected to reduce diesel consumption by 200,000 litres within two years of beginning. During construction, about 40 high-skilled workers will be required."